关于我们
您现在的位置:
Homepage
/
/
/
Capping of the main body of the comprehensive building of Zhaojin Grinding Media
Check category

Capping of the main body of the comprehensive building of Zhaojin Grinding Media

  • Categories:Zhaojin News
  • Author:
  • Origin:
  • Time of issue:2017-12-01 15:56
  • Views:

(Summary description)

Capping of the main body of the comprehensive building of Zhaojin Grinding Media

(Summary description)

  • Categories:Zhaojin News
  • Author:
  • Origin:
  • Time of issue:2017-12-01 15:56
  • Views:
Information
On the morning of November 11, 2017, the sky was clear and the sun and the moon were shining. With the completion of the pouring of the last truckload of concrete for the roof panel, the main structure of the comprehensive building of the wear-resistant materials company was successfully capped.At the construction site, firecrackers rang out and there was thunderous applause.Leaders of group companies and mining companies at all levels came to guide, and under the attention of all participating units, they witnessed the most exciting phased results since the construction of the project started.
The wear-resistant materials project is located in the east of Guoda Road and north of Longqing Road, Zhaoyuan City. The project covers an area of 56,676 square meters, with a total construction area of 28,760 square meters. It produces 200,000 tons of new wear-resistant materials annually. The main construction is a comprehensive building of 4,756 square meters, a factory building of 23,646 square meters, a power distribution room of 312 square meters, and a circulating pool of 5000m3.As a benchmark project in the Zhaojin mining industry, the project must meet the standards of “Yantai City-level safe and civilized construction site” and “Yantai City high-quality structural engineering” for the single project of the comprehensive building and factory building.At this point, the first stage of the project was successfully completed, laying a good foundation for the next stage of construction, and providing a good guarantee for the completion of the project with guaranteed quality and quantity.
On the same day, leaders such as Jia Hanyi, safety director of Zhaojin Group, Dong Xin, vice president and production director of Zhaojin Mining Industry, Wang Chunguang, assistant president and safety director of Zhaojin Mining Industry, and others visited the scene. While witnessing the moment on the spot, they still asked in detail about the difficulties encountered during the construction process, and asked the project command to summarize its experience, further strengthen on-site management, improve the level of on-site management personnel, and move forward towards the overall completion goal of the project.
After the capping was over, leaders at all levels went deep into the construction site, carefully checked and asked about the overall progress of the project, and made further deployment and planning for the next work.

286 Guoda Road, Zhaoyuan Economic & Technological Development Zone, Shandong Province , China

+86-535-8091333

Username used for comment:
客户留言
Description:
验证码